A Level 2 charger adds roughly 20 to 40 miles of range per hour, enough to fill most EVs overnight. We install hardwired and plug-in chargers from the major brands, in garages and on exterior walls.
Before quoting, we check whether your panel has room for a 40 to 60 amp circuit. If it does not, a load management device or panel upgrade may be needed, and we explain both options.
We pull the permit and can provide the paperwork some utilities and manufacturers ask for with rebates.
Common questions
Can my panel handle a charger?
Many 200 amp panels can. With 100 amp service it depends on your other loads, which we calculate.
Hardwired or plug-in?
Hardwired is usually tidier and can allow a higher charging rate; plug-in lets you take the charger with you if you move.
Are there rebates?
Federal and utility incentives change often. Check your utility and the charger maker before you buy.
Serving
Scranton, Wilkes-Barre, Clarks Summit, Pittston, Dunmore, Moosic and Taylor